The Missouri Tigers are doing a drastic renovation of Faurot Field this offseason, which includes a complete rebuild of the south end zone section.

During the Tigers’ spring game on Saturday afternoon, the stadium looked much different, as the entire south end zone structure was simply gone.

Below, you can see the empty lot that now stands opposite the Rock M in the stadium:

https://twitter.com/Mizzou/status/985199510077964289

The construction project is going to take place throughout the 2018 season, but is expected to be completed ahead of the 2019 campaign.

For now, though, Faurot Field looks much different than it has for the last few decades.